Fabrication Workshop Facilities

services_facilities.jpg

At Pipetawse Ltd., we can offer approximately 24,000 square feet of production area, divided into 3 separate fabrication shops, all with their own overhead craneage. Together, they have a joint capacity of producing 2,950 Man-hours per week based upon single shift working.

As we have three individual fabrication shops, we can offer complete material segregation throughout the entire fabrication process. We have workshops dedicated to Carbon Steel, Stainless Steel, and Exotic Materials, which eliminates the risk of cross-contamination.

In addition to our large fabrication area, we have covered storage area of 3300 square feet, 3 acres of fenced lay down area, and a 1,300 square foot reinforced concrete slab for trial-erection of steelwork, which is capable of taking loads up to 600T. All of our facilities are fully secured by CCTV and alarms.